The Daily Blog

Monday May 6, 2024.

Written by Liz Furlong | May 6, 2024 3:19:22 PM

 

Town Growth Report: April 

 

Take a look at an overview of the growth we have seen in Las Catalinas over the past month as we begin May.

 

 

 

Complete residences: 181 

Homes Under Construction: 80 

 

For Sale 

Single Family Lots Available: 12/105 

 

Designed Homes 

Montaña Flats Available: 18/38 

Lantana Residences Available: 9/25 

  

33 Paseo del Parque Delivered 

 

This remarkable home, full of love and joy, couldn't be more representative of the aspirations we have for El Prado community. Heather and Cogdell Bradshaw will get to enjoy views of Parque Central from their front balconies, and we can't wait to hear their laughs while walking along Paseo del Parque. 

 

The first floor is a light and bright main space of kitchen, living, and ding that opens to the private back terrace with pool. The upper floor hosts bedrooms, each with distinct views. The timeless palette of blues and whites both inside and out creates a friendly and refreshing atmosphere. 

 

Los Altos Flats Begins Construction 

 

 

We're excited to share some additional updates on Los Altos Flats. Construction of the first pair of flat buildings on Avenida de los Altos commenced last week. Designed by Castillo Arquitectos, each of the two villas will accommodate six flats. The architectural design carefully integrates with the natural landscape through terracing, while a series of outdoor spaces add to the villa ambiance, offering breathtaking views for residents. Alfa Co. is slated to complete construction by mid-next year. 

 

 

Here’s to another month full of developments.