The Daily Blog

Saturday, November 4th, 2017

Written by Neal Herman | Nov 4, 2017 2:00:38 PM

Move in date for our new neighbors at 3 Calle la Ronda is tomorrow!  In preparation, we began to open up the passageway between 3 Calle la Ronda and 5 Calle la Ronda.  This photo was taken of the lower portion of the connection.  The stairs are covered in plastic so the walls on both sides can be painted, then the landscaping will go in.

These passageways are so inviting.  You just wonder what is up there, and feel inspired to walk up the stairs and find out.